CAT A Refurbishment of 4th & 5th Floor

The Challenge 

To refurbish two floors of a commercial building in central London totalling 2514 sqm. Six of eight floors were occupied. Consideration for noise and disruption whilst other floors were operational during the refurbishment works.

The Solution

To modernise two office floors which required refurbishment at the end of tenancy. This included new lighting, heating, air conditioning, decoration and toilet upgrades.

The Benefits

The office floors have been designed to allow for flexible and efficient space planning and have been constructed to a high specification, with a BREEAM ‘Excellent’ rating. The design of the building and services systems provides occupiers with reduced whole-life costs and a high degree of flexibility in use.

Behind the scenes

Skyline Green behind the scenes

As managing director and majority shareholder at Skyline Green Ltd, I couldn’t be prouder of the team behind the scenes; their dedication and determination to meet their potential as a team have been the backbone of our successful growth.